Ask HiltiAskLearnArticles
Ask Hilti

Pre-installation Preparation

From Design to Installation

The webinar will cover the preparation work that should be carried out before drilling to ensure installation quality. There are several factors which may affect the installation process. Pre-works for examples grout/adhesive selection, concrete surface condition, scanning etc. are essential to ensure the quality, performance and consistency of PIR.


0 Sessions
|
Hilti CPD

Sorry, no results found.

Content is loading